Due
to Abertura's Uniqueness, Complete Technical Specs will be slow in coming,
as we have to build the place from the ground up. If anyone would like
to help, feel free. :)
Here
is the Top down Colour coded layout of the Station
For
the time Being we have two Concept Images available. These images are
Concepts and prone to changes, but they give you an impression of what
we are going for.
This
is a basic cross section of Abertura, due to the circular nature of
each deck, individual floor plans may be forthcoming. In Regards to
lifts, there are four within the main column (N, S, E, W facing respectively),
the S-Facing one is the only one to go to C&C. There are also other
two other lifts that go from Sublevel 5 to Level 9. As well as two staircases
in the Atrium going up to Level 3. I've been thinking of changing the
shape to a Tier/Terraced look, rather than a polygon.
Quarters
Assignments:
Level 16, Alpha section, Captain's Quarters
[#1] - Captain Thelsh, CO
Level 16, Beta section, Executive Quarters [#2] - Commander Thomas Puller,
XO
Level 16, Gamma section, Executive Quarters [#3] - Laevon, Administrator
Level 15, Alpha section, Quarters #2 -Ensign T. Hamilton, CVO
Level 15, Delta section, Quarters #6 - Lt. Brock, CSO; LtJG K. Kedi,
CIV
Level 15, Gamma section, Quarters #9 - Lt. A. Jadahn, CBO; Lt. M. Lambert,
CEO
Level 15, Beta section, Quarters #11 - Ensign Cerdan EO; Ensign King
CSEC
Level 14, Delta section, Quarters #16 - Ensign R. Laramee, VO; Ensign
R. Cihan, BO
Barracks Inhabitants:
Klingon Garrison: 115 (Currently
78. 37 were recently killed in conflict with J'H)
Jem'Hadar Column: 60 (15 are female
J'H) (Currently 54. 12 were recently killed in conflict with Klingons.
6 more produced as replacements)
Levels
Layout
Level 17
Command and Control Center, Transporter
Pad #1.(Lvl 1) CO's Office (Lvl 2)
Hatchery, Cloning Facilities, Life
Support Systems
Sub-Level 9
Computer Core, Subsystems, Waste
Processing, Recycling Center
Sub-Level 10
Reactors
Above
is a concept of C&C, its not very good as some things are messed
up due to scale(I'm not very good at architectural drawings) and its
not 3-D. The Air Traffic display is a 2-D projection onto the arc of
the Dome on the 2nd Level in front of the Air Traffic Table there. The
Main Viewer is a 3-D projection above the Pit, at the same level as
the Balcony of the 2nd Floor. So the CO or whomever can address the
Viewscreen from that location or down near the Pit.